Timber bridge replacement promised at Calvert and Ebenezer

THE Ipswich City Council has committed $4.65 million to fund the replacement of two local timber bridges, this financial year.

Tom Kerle Bridge on Hiddenvale Road, Calvert will be replaced at a cost of $2.6 million and $2.05 million will be spent on a new bridge on Keanes Road at Ebenezer.

Cr Russell Milligan said the 18.5 metre two-span Keanes Road timber bridge was constructed in 1940 and crosses the Bremer River.

“The bridge condition and load capacity have been deteriorating and after a 2016 report, Ipswich City Council decided to replace it,” he said.

“Construction will take six to eight months.”

However, he said an exact start date for the project has yet to be set.

“Re-alignment of the new bridge allows for the existing bridge to remain in use while work is carried out.

“When the new bridge is opened, the old bridge will be demolished.”

The works will also include improved entry and exits to the bridge, improved road safety with new barriers and culvert upgrades.

“The new bridge has been designed with a 100-year life span,” Cr Milligan said.

Cr Kate Kunzelmann added that this is a win for the community.

“This site has significance as a flood forecast location for both the Bureau of Meteorology and the South East Queensland Water monitoring equipment.

“Minor relocation of this equipment is expected as part of the bridge replacement.

“A minor property truncation is required on the western side of the project to assist with road safety and improved sight lines.

“The new bridge will be able to carry larger commercial vehicles, which will better service community requirements.”

THE Tom Kerle Bridge on Hiddenvale Road at Calvert has been identified by council as in poor condition and costly to maintain.

“Council decided on a full replacement of the four-span 27.6m timber bridge which crosses the Western Creek,” Cr Sheila Ireland said.

“The new structure is being constructed adjacent to the existing bridge and full road closure will not be necessary.

“The date of construction has yet to be determined but will last six to eight months.”

Cr Jacob Madsen added that the new bridge will be two lanes with shared pedestrian access on the northern side.

“It has been designed to carry heavy vehicles,” he said.

“The new inland rail project is likely to have some impact on the area and as these works will be completed ahead of that, it will assist with future heavy vehicle access during the construction phase.”

Digital Editions


More News

  • Father and son’s light tribute

    Father and son’s light tribute

    Purchase this photo from Pic Store: 524233 A retired Glamorgan Vale dairy farmer’s Christmas decorations light up his neighbourhood in December. Geoff Beattie goes all out and has over 400,000…

  • Rosewood celebrates

    Rosewood celebrates

    Purchase this photo from Pic Store: 524244 Families flocked to the Rosewood Showgrounds on Friday 12 December for the annual Rosewood Christmas Festival, organised by the Rosewood and District Supporting…

  • Cabanda Care transitions

    Cabanda Care transitions

    Purchase this photo from Pic Store: 525016 Rosewood retirement home Cabanda Care is now owned by Lutheran Services. Cabanda Care was built in the 1970s by the Rosewood community for…

  • Bush campground plan

    Bush campground plan

    Graham and Jude Turner are planning to expand the accommodation offerings on their Hidden Vale property outside Grandchester. Applying through their company, Jilrift Pty Ltd, the couple are hoping to…

  • Bootscootin’ in Marburg

    Bootscootin’ in Marburg

    Line dancers donned festive outfits and cowboy boots for a Christmas social held by Belt, Buckles and Boots this week, marking the group’s end-of-year celebrations. Instructor Ms Angie Harris said…

  • Christmas spirit in Lowood

    Christmas spirit in Lowood

    The Lowood Show Society welcomed families and locals to its annual Lowood Christmas Carnival, with fine weather setting the scene for a festive evening of entertainment and community spirit. Show…

  • Elf on the shelf is work we can’t shirk

    Elf on the shelf is work we can’t shirk

    If I found time machine I’d travel back to November 2017 and talk myself out of inviting an Elf on the Shelf into our home over Christmas. I have three…

  • Festive fun in Rosewood

    Festive fun in Rosewood

    Purchase this photo from Pic Store: 524244 Families flocked to the Rosewood Showgrounds on Friday 12 December for the annual Rosewood Christmas Festival, organised by the Rosewood and District Supporting…

  • Tyre trees delight passersby

    Tyre trees delight passersby

    Purchase this photo from Pic Store: 522963 A Mutdapilly local had the crazy idea to build faux Christmas trees using tyres of differing sizes. They were painted green and once…

  • Cold moon lights up Rosewood night sky

    Cold moon lights up Rosewood night sky

    Purchase this photo from Pic Store: 522848 A flying fox cast a spooky figure as it explored the night sky over Rosewood last week. Its illumination from the splendour of…